Flow cell maintenance
Flow cell maintenance has been described in the user manuals. In addition, this tutorial contains movies that show the procedure in more detail. Before using this material read the instructions and warnings in the user manual.
Flexcell and ReactorCell (dis-)assembly
- Step 1: Flexcell and ReactorCell disassembly
- Step 2: Flexcell and ReactorCell assembly
uPrepCell(dis-)assembly
- Step 1: uPrepCell disassembly
- Step 2: uPrepCell assembly
- Step 3: Filling the uPrepCell
- Step 4: Behavior of gas bubbles in uPrepCell
Sencell salt bridge maintenance
- Step 1: Sencell: remove frit from salt bridge
- Step 2: Sencell: new frit in salt bridge (replace frit only if necessary)
- Step 3: Sencell: fill salt bridge
VT03 cell (dis-)assembly
- Step 1: VT03 disassembly
- Step 2: VT03 assembly
VT03 cell and salt bridge reference
- Step 1: VT: disconnect the cell from the HPLC
- Step 2: VT: recognize air in the sb REF
- Step 3: VT: remove frit from sb REF
- Step 4: VT: make new frit from cotton wool
- Step 5: VT: refill with fresh and saturated KCl, add KCl crystals
- Step 6: VT: install and fill the cell with mobile phase (microbore LC: with aid of syringe filled with mobile phase, standard LC: by switching on the pump at 0.5 - 1 mL/min, air escapes through REF opening)
The movies in this tutorial require a mediaplayer plugin, if not installed you will be prompted to download it. Depending on your connection speed loading movies can take a moment or two...