Support

Docs and downloadsTutorialsSoftware recordingsMaintenance videosTroubleshootingTraining
Training program

Training program

Hands-on sessions service training

Day 1

DECADE II detector and ROXY Potentiostat
- Dialogue software
- Firmware updates
- Installation and options (valves)
- IQ/OQ/PQ
- Installation LM35 heater control upgrade kit
- Installation additional cell control option
- Exchange of control- and sensor-board    

Flow cells (VT-03, ReactorCell, u-PrepCell and FlexCell)
- Disassembly, assembly and installation
- Maintenance of different electrodes

Day 2

AS 110 (and AS 100) autosampler
- Replacement of valve rotor seal
- Replacement of syringe
- Replacement of needles
- Replacement of buffer tubing
- Switching valve verification
- Check/adjustment of needle penetration point
- Check/adjustment of needle depth

ALEXYS system
- Installation documents and checklists
- PCI card installation in personal computer
- Passivation procedure
- PQ

Day 2 cont'd

LC 110 & LC 110S pump
- Disassembly of pump head
- Seal replacement procedure
- Flow rate measurement

Clarity software for ALEXYS
- Clarity concept
- Configuration, methods and running samples
- Data processing

OR 100 / OR 110 organizer rack
- Exchange degasser cartridge
- Exchange of pulse damper
- Installation second pulse damper

Day 3

ROXY system
- Installation documents and checklists
- Installation of ROXY-EC system
- Dialogue software
- Working with event tables for optimization
- Demonstration example