|
Day 1
DECADE II detector and ROXY Potentiostat - Dialogue software - Firmware updates - Installation and options (valves) - IQ/OQ/PQ - Installation LM35 heater control upgrade kit - Installation additional cell control option - Exchange of control- and sensor-board
Flow cells (VT-03, ReactorCell, u-PrepCell and FlexCell) - Disassembly, assembly and installation - Maintenance of different electrodes
Day 2
AS 110 (and AS 100) autosampler - Replacement of valve rotor seal - Replacement of syringe - Replacement of needles - Replacement of buffer tubing - Switching valve verification - Check/adjustment of needle penetration point - Check/adjustment of needle depth
ALEXYS system - Installation documents and checklists - PCI card installation in personal computer - Passivation procedure - PQ
|
Day 2 cont'd
LC 110 & LC 110S pump - Disassembly of pump head - Seal replacement procedure - Flow rate measurement
Clarity software for ALEXYS - Clarity concept - Configuration, methods and running samples - Data processing
OR 100 / OR 110 organizer rack - Exchange degasser cartridge - Exchange of pulse damper - Installation second pulse damper
Day 3
ROXY system - Installation documents and checklists - Installation of ROXY-EC system - Dialogue software - Working with event tables for optimization - Demonstration example
|