Service training

Hands-on sessions distributor service training

Day 1

DECADE II & Elite Detector and ROXY Reactor

  • Dialogue software
  • Firmware updates
  • Installation and options (valves)
  • IQ/OQ/PQ
  • Installation additional cell control option
  • Exchange of control- and sensor-board    


Sencell, VT-03, ReactorCell, u-PrepCell and FlexCell

  • Disassembly, assembly and installation
  • Maintenance of different electrodes

Day 2

AS 110 (and AS 100) autosampler

  • Replacement of valve rotor seal
  • Replacement of syringe
  • Replacement of needles
  • Replacement of buffer tubing
  • Switching valve verification
  • Check/adjustment of needle penetration point 
  • Check/adjustment of needle depth

ALEXYS system

  • Installation documents and checklists
  • PCI card installation in personal computer
  • Passivation procedure
  • PQ

 

Day 2 cont'd

LC 110 & LC 110S pump

  • Disassembly of pump head
  • Seal replacement procedure
  • Flow rate measurement


Clarity software for ALEXYS

  • Clarity concept
  • Configuration, methods and running samples
  • Data processing

OR 100 / OR 110 organizer rack

  • Exchange degasser cartridge
  • Exchange of pulse damper
  • Installation second pulse damper

 

Day 3

ROXY system

  • Installation documents and checklists
  • Installation of ROXY-EC system
  • Dialogue software
  • Working with event tables for optimization
  • Demonstration example